"Luminaire" covers every kind of indoor and outdoor lighting product, and CB certification applies to all of them. The safety standard is not one document but a family: IEC 60598-2 has a separate part for each luminaire type, and the part that applies follows from what the fitting is.
What counts as a luminaire
A luminaire is a lighting product, and the term is general: it covers all types of indoor and outdoor lights. CB certification of all such luminaires is mandatory where the scheme is used as the route to market.
Completing the process requires three things: safety testing, a test report, and the certificate.
Which IEC 60598-2 part applies to which luminaire?
| Type of luminaire | Safety test standard |
|---|---|
| Fixed general luminaire | IEC 60598-2-1 |
| Recessed light | IEC 60598-2-2 |
| Street light | IEC 60598-2-3 |
| Flood light | IEC 60598-2-5 |
| Hand lamp | IEC 60598-2-8 |
| Lighting chain | IEC 60598-2-20 |
| Rope light | IEC 60598-2-21 |
| Emergency light | IEC 60598-2-22 |
IEC 60598-1 carries the general requirements; each part of IEC 60598-2 adds the particular requirements for one type. Both apply.
How products are classified
By ratings, internal components and type. That combination is why a catalogue description is not enough to scope a project: two fittings that look alike from outside can fall under different parts if their construction differs.
The practical sequence is to submit the technical documentation first, so the complete list of certificates required for sale can be established before anything is tested. Testing against the wrong part is simply a repeat.
What the certificate buys you
The CB Scheme is a mutual-recognition system: test once, then convert that evidence into national approvals across the member countries.
The mechanics decide who you apply to, so settle them before the first invoice:
| Step | Who does it |
|---|---|
| Application | You, to any IECEE National Certification Body (NCB) |
| Testing and assessment | A CB Testing Laboratory (CBTL) assigned by that NCB |
| Evidence issued | CB Test Certificate plus the CB Test Report |
| National approval | Another member NCB, on administrative review of those two documents |
Over fifty countries participate, which is what makes the scheme useful for a lighting range sold across several markets. The report is the asset; the certificate alone will not carry a national application.
Why do national differences matter?
Countries are permitted to declare deviations from the IEC text, and those declared national differences are published rather than negotiated case by case. They are also the one thing a CB certificate does not dissolve.
The practical consequence: name your target markets before testing starts. A CBTL can test the declared differences for those countries inside the same programme at marginal cost. Discovering them at the national application stage means going back to a laboratory with the samples you have already shipped home.
Which standards apply to a luminaire besides IEC 60598?
IEC 60598 answers the safety question. A luminaire placed on most markets has to answer three or four others, each with its own standard:
| Question | Standard |
|---|---|
| Radio disturbance emitted | CISPR 15 (EN 55015) |
| Immunity to disturbance | IEC 61547 |
| Harmonic current drawn | IEC 61000-3-2, Class C for lighting |
| Optical radiation hazard | IEC 62471, photobiological safety |
| Control gear and drivers | IEC 61347 series |
For LED products the last two are where projects stall. Photobiological classification under IEC 62471 depends on the emitter and the optic in front of it, so a change of lens on an otherwise identical fitting can move the result. The driver is assessed in its own right under IEC 61347, separately from the luminaire.
For the European route specifically, the three directives and the declaration that carries them, see luminaire certification in Europe.
What to send with an enquiry
The rated voltage and power, the light source and driver used, the intended mounting and environment, the target markets, and the technical file, circuit diagram, bill of materials, photometric data. Those five settle both which part of IEC 60598-2 applies and which companion standards come with it.
Sources
- IEC 60598-1, Luminaires, Part 1: General requirements and tests
- IEC 60598-2 series, Luminaires, Particular requirements
- IECEE CB Scheme, IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Components
- CISPR 15 / EN 55015, Limits and methods of measurement of radio disturbance characteristics of electrical lighting and similar equipment
- IEC 61547, Equipment for general lighting purposes, EMC immunity requirements
- IEC 61000-3-2, Limits for harmonic current emissions, Class C applies to lighting
- IEC 62471, Photobiological safety of lamps and lamp systems
- IEC 61347 series, Lamp control gear
Frequently asked questions
Which standard applies to my luminaire?
The part of IEC 60598-2 that matches the type. Fixed general takes -2-1, recessed -2-2, street -2-3, flood -2-5, lighting chains -2-20, rope lights -2-21, emergency -2-22, and hand lamps -2-8. The type decides which part applies, whatever the technology inside it.
What does CB certification involve?
Safety testing, a test report, and the certificate itself. The CB report and certificate can then be used to obtain national certification in other member countries, which is the point of the scheme, one testing programme feeding many markets.
Does a CB certificate remove testing everywhere?
Almost. Other member NCBs accept the CB Test Certificate and CB Test Report on administrative review and issue their own national certificate from it. What survives is the national differences, deviations a country has declared against the IEC standard. Those are tested, and the cheapest place to cover them is the original programme.
How are products classified for this?
By ratings, internal components and type. Two fittings that look similar can land under different parts of the standard if their construction differs, so the technical documentation has to be submitted before a scope of work can be quoted accurately.
Not sure which of these applies to your product? Send it and we will tell you